Excavations at Maiden Castle (Q2026)

From Beyond Notability
No description defined
Language Label Description Also known as
English
Excavations at Maiden Castle
No description defined

    Statements

    0 references
    0 references
    Surveyor of Prae Wood Earthworks (English)
    Directed the excavation of three gateways. (English)
    Was present for three seasons. (English)
    Supervised most of the laborious excavation of the 'Fosse' and the clearing of the theatre. (English)
    Was present for four seasons. (English)
    Excavation Supervisor (English)
    Worked as Supervisor for two of the four seasons (English)
    Voluntary Assistant (English)
    Reported on the coins (English)
    0 references